
[Jun-2026] The SAP C-P2W22-2504 Exam Test For Brief Preparation
Revolutionary Guide To Exam SAP Dumps
NEW QUESTION # 24
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Create an object selection variant for production-planning-related alerts
- B. Assign the overall profile to the authorization profile
- C. Create an object selection variant for alerts according to the priority of ATP categories
- D. Assign the alert profile to the overall profile
Answer: A,D
NEW QUESTION # 25
What is the focus of repetitive manufacturing?
- A. Production of lot size one
- B. Low volume production
- C. Detailed tracking of production orders
- D. Period and quantity-oriented production
Answer: D
NEW QUESTION # 26
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.
- A. To determine the lowest explosion level at which a material occurs in all the product structures
- B. To determine the priority of alternative components inside the material BOM (bill of material)
- C. To determine the sequence in which materials are planned in MRP
- D. To determine the use of subitems inside the material BOM (bill of material)
Answer: A,C
NEW QUESTION # 27
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing a delivery address
- B. Changing an operation time
- C. Changing a storage bin
- D. Changing a dependent requirement
Answer: B,D
NEW QUESTION # 28
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Work center
- B. Routings
- C. Production order
- D. Bill of material
Answer: B,D
NEW QUESTION # 29
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
- A. Material is only kept available in small quantities in production.
- B. Material stock is built up for a long period of time in production.
- C. Replenishment is only triggered when components are required.
- D. Replenishment is always triggered on a regular basis.
Answer: A,C
NEW QUESTION # 30
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. One-off events
- B. Past sales order quantities
- C. Past quotation quantities
- D. Past production planning quantities
- E. Market intelligence
Answer: A,B,E
NEW QUESTION # 31
You are a consultant on an SAP S/4HANA Cloud greenfield project.
Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.
- A. Timeliness
- B. Accuracy
- C. Stability
- D. Efficiency
Answer: C,D
NEW QUESTION # 32
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.
- A. Scheduling agreement schedule line
- B. Purchase order
- C. Production order
- D. Planned order
Answer: A,D
NEW QUESTION # 33
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The production quantity must only lie within the lot-size range of the routing in the production version.
- B. The production version must NOT be deleted.
- C. The basic start date of the order must lie within the validity period of the production version.
- D. The production quantity must lie within the lot-size range of the production version.
- E. The basic end date of the order must lie within the validity period of the production version.
Answer: A,C,D
NEW QUESTION # 34
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.
- A. In make-to-stock production, you can manually create production orders
- B. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order
- C. In assembly production, a sales order triggers the creation of a production order
- D. In assembly production, confirmation of scrap triggers the creation of a production order
Answer: A,C
NEW QUESTION # 35
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.
- A. Date
- B. Change number
- C. Material BOM usage
- D. Lot size
Answer: A,D
NEW QUESTION # 36
When do you use variant bills of material (BOMs)?
- A. When multiple materials have multiple BOMS
- B. When multiple materials have similar BOMS
- C. When a material has multiple BOMs
- D. When a material has a configurable BOM
Answer: B
NEW QUESTION # 37
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.
- A. Float before production
- B. Load time
- C. Transit time
- D. Queue time
- E. Setup time
Answer: A,D,E
NEW QUESTION # 38
How can you achieve a feasible production plan when there are capacity constraints?
Note: There are 3 correct answers to this question.
- A. Increase the capacity supply in a time-phased interval
- B. Determine a time period with available capacity on the planning board
- C. Execute an infinite production planning run for the critical resources
- D. Form optimum sequences to reduce setup times
- E. Reduce the planning time interval
Answer: A,B,D
NEW QUESTION # 39
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. When you post the goods receipt
- B. When you record inspection results
- C. When you execute batch determination
- D. When you release the batch
Answer: A,B
NEW QUESTION # 40
In SAP documentation for MRP in Advanced Planning, you read that the MRP creates new planned orders through infinite scheduling. What does this mean for the capacity requirements of the new planned order?
- A. MRP creates the capacity requirements without considering existing load on the resources.
- B. MRP automatically assigns the capacity requirements after the last scheduled operation for each resource.
- C. MRP creates the capacity requirements on resources at the earliest possible production time.
- D. MRP automatically assigns the capacity requirements to resources with the earliest available capacity.
Answer: A
NEW QUESTION # 41
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. In which storage location is the BOM required?
- B. When does the BOM need to become effective?
- C. Which base unit of measure must the BOM have?
- D. For which plant can the BOM be defined?
Answer: B,D
NEW QUESTION # 42
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.
- A. It can be used in all SAP S/4HANA Cloud editions.
- B. Customers can use the dashboard in the dev, test, and production tenants.
- C. Customers can grant access to the dashboard to partners.
- D. It can be accessed by using SAP For Me.
Answer: C,D
NEW QUESTION # 43
How would you define a pegging structure for an order in the context of Advanced Planning?
- A. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
- B. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
- C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements
- D. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
Answer: C
NEW QUESTION # 44
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to one batch if the product quality changes during production.
- B. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
- C. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
- D. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
Answer: B,C
NEW QUESTION # 45
In the context of the capacity scheduling table, how do you define a pacemaker work center?
- A. By assigning it to the production version
- B. By assigning it to the capacity scheduling table
- C. By assigning it to the bottleneck operation
- D. By assigning it to the first operation of a routing
Answer: A
NEW QUESTION # 46
In which master data objects do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.
- A. Routing
- B. Production version
- C. Work center
- D. Material master
Answer: A,C
NEW QUESTION # 47
......
C-P2W22-2504 Free Study Guide! with New Questions: https://passleader.torrentvalid.com/C-P2W22-2504-valid-braindumps-torrent.html